Just a record of what we got done and when.
8/11 [1st Day of Rev. 9]
Surveyed plot, marked 201x201 border. Cleared half the forest. Temp. farms set up.
8/12
Edited plot due to land disputes. Forest cleared. Terraforming of Mount UMC begun. Modreq for protections first granted. Dump chests set up. Free tool chests set up.
8/13
Mount UMC 60% terraformed. Protections extended. Half the land disputes reconciled.
8/14
Mount UMC flattened. Center tower boundary marked. East Road Extended.
8/15
Skull Cave over East Road added by atarianimo. Map room excavation begun. Donations drive begun.
8/16
Map room excavated & Overworld map constructed. Permanent UMC storage room constructed. Dump chests & such transferred entirely to storage room. Public max enchanting table set up. Public Ender Chest set up.
8/17
Overworld Map begun. UMC mine created. Public farms begun. Shell of center tower begun.
8/18
Public farms completed. West wall of central tower 60% complete.
8/19
West wall completed. Balconies begun. NE embassy tower ground-2nd floors completed. NW embassy tower begun.
8/20-22
Terraforming of smaller mountain completed. SE and SW embassy towers begun.
8/23
First floor wall completed. All 4 embassy towers now in progress.
8/24
Pony's pen built. Second and first floor balconies completed. Overworld map completed.
8/25
Embassy towers continued. Running very low on glass!
8/26
Floors 1-3 complete.
8/27
Tidied up the elevators, ladders, and water drops. Began floor 4 balcony. Added directory, builder, and donor boards. Started sign ups for embassies.
8/28-9/6
Floor 4-6 complete, shells for SW and SE towers complete up to level 10. Floors 7-8 balconies complete.
9/7-9/10
Floor 7 complete, mooshroom farm added, AFC added, 15 embassies assigned.
9/11-9/22
Floors 8-10 complete, roof begun, independent embassies available, 7 embassies complete, 23 embassies assigned.