This post has been de-listed
It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.
Hello, Nerds. As a followup to last week's TRAVEL construction update, I've prepared a more detailed mapping of the northeast routing that is now under construction.
The solid line on the map represents the existing and accessible TRAVEL line up to the tunnelhead barricade marking the beginning of the construction zone. The faded line represents the sections still under construction or yet to begin construction.
There will be four new stations, of which the first will provide access to/from the Northeast Highway, the second will serve the surrounding two mountain builds and provide outbound-only transfers to the 1000 CARTS loop, the third will serve Clearmont and Horsegoth, and the fourth will serve Argoth with the potential to contain a future shortline transfer to N.E.A. central plaza. Following this fourth station, the line will terminate at the northeast nether portal's rail hub.
Edit: After reviewing the route again, I may add one more station at Y.2175 - Y.2200 since it's adjacent to the highway and the end of a small local railway.
When this extension opens, it will mark the completion of TRAVEL Line 1 (Yellow). Following this, there will be a brief pause in construction to allow for further creation of signage using the mapworld. When construction resumes, it will be in the form of a new TRAVEL Line 2 (Magenta), to serve the western half of the map.
In the meantime, builders are kindly asked to please respect the locations that have been marked with andesite and glowstone to designate pier and station sites.
Subreddit
Post Details
- Posted
- 8 years ago
- Reddit URL
- View post on reddit.com
- External URL
- reddit.com/r/mcpublic/co...