Coming soon - Get a detailed view of why an account is flagged as spam!
view details

This post has been de-listed

It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.

11
TRAVEL Construction Update: 16 February.
Post Flair (click to view more posts with a particular flair)
Post Body

Since the most recent release 8 days ago, construction has been underway on the Phase 4 bridge across the southeastern ocean. That project is still ongoing, with completion expected several days from now.

In the meantime, there is one new piece of TRAVEL-related infrastructure now open for public use: an express rail connection from TRAVEL Avalon Station to the main Avalon city rail station, constructed by Avalon's rail consortium and accessible via a second platform located below concourse level at the TRAVEL station.

A second entrance has also been added to Viridian Heights Station with a short road connection to Ironstar.

Here is an updated TRAVEL system map showing the current system, as well as the Phase 4 segment presently under construction and a portion of the Phase 5 plan.

Please note: the Phase 5 route shown on this map is highly preliminary and will definitely change. Modifications may prove minor or significant, and will be determined when detailed route mapping begins following the opening of Phase 4.


Public Advisories:

  • As the large bridge is still under construction, there are significant falling hazards (and approach spans are not yet installed). Nerdizens are advised to cross this ocean using the CARBON road and rail located to the north, until approaches are complete and barriers are raised for horse safety.

Future Expansions:

  • Phase 5: This long-distance phase will entail the extension of the TRAVEL Yellow Line from its present northern terminus to the cities of the N.E.A. Construction will involve significant tunneled segments as well as standard elevated lines, and an as-yet-undetermined number of new stations.

  • Subsequent Phases: Detailed plans for further expansion will be made upon the completion of Phases 4-5. Future expansion will likely include the addition of a western line serving some or all of the following communities: Hyrule, Two Lips, Blackriver, Rose, Puggleston, Metal Mountains, and Pico.


Special Call for Donations:

Update: Thanks to the generous contributions of Metal Mountains and Sybercity, the need for netherbrick has been quickly met! At this time there are no pressing material shortages.

Author
Account Strength
100%
Account Age
15 years
Verified Email
Yes
Verified Flair
No
Total Karma
253,449
Link Karma
2,945
Comment Karma
250,338
Profile updated: 6 days ago
Posts updated: 10 months ago

Subreddit

Post Details

We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
8 years ago