Coming soon - Get a detailed view of why an account is flagged as spam!
view details

This post has been de-listed (Author was flagged for spam)

It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.

1
Progress Report
Post Body

Everything has been progressing as planned, with some minor setbacks due to circumstances beyond our control. If a project is not complete and you wish to help, contact me for details and help.

List of Completed Projects

Agricultural Collectivization

Flag

List of In progress projects:

Rail Digging: 3/4ths complete

Mainland Bridge: 1/2 complete

Vault: A temporary vault has been constructed. We have all the materials to construct a complete one, however, those materials are still in Olympia Proper

Terrace construction: Two terraces out of an unplanned number have been constructed List of Planned Projects

Repairing and Redesigning the Buildings and roads

Construction of new Roads

Capital Building

Residential buildings (This is a priority, we need some creative buildings)

Sand mining industry

So far the only setback is some time-zone problems making it hard to coordinate plans between me and the general secretary. Everything else is going on schedule.

Duplicate Posts
7 posts with the exact same title by 6 other authors
View Details
Author
Account Strength
0%
Account Age
12 years
Verified Email
Yes
Verified Flair
No
Total Karma
4,806
Link Karma
182
Comment Karma
4,624
Profile updated: 6 months ago
Posts updated: 7 months ago

Subreddit

Post Details

We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
9 years ago