Is it possible to have one continuously connected power grid with switches to allow multiple power stations to feed into the grid at various points I.e antiquated voltage drop locations from high demand or does each network max out at 18 MW for the entirety of the network?

How does one maximize the production at a nuclear plant? I have plenty of workers who are jobless nearby and don't seem to fill the vacant spots.

Does the power grid prioritize local power consumption before it exports it ?

Thanks for your help in advance!

Author
Account Strength
100%
Account Age
5 years
Verified Email
Yes
Verified Flair
No
Total Karma
1,280
Link Karma
1,183
Comment Karma
97
Profile updated: 4 days ago
Posts updated: 2 months ago

Subreddit

Post Details

We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
3 years ago