This post has been de-listed
It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.
Might be a fundraising issue. USC was able to quickly raise hundreds of millions of dollars for the new football facility. Progress on the facility is happening fast.
Same canāt be said about the other projects.
Youāre right about surface lots running dry. Thereās a small one right next to old Fluor that can be expanded into. Thereās also one next to the dental school. Thatās about it other than GFS and McClintock.
I would imagine at least some of it would be housing.
There are still flat parking lots that USC can use to build more facilities just like they are doing with the new CS building.
Hopefully something concrete is announced soon because the vacant lot of Marks and Trojan is pretty large. āSite improvements and landscapingā to the lots in 2024 lol.
Subreddit
Post Details
- Posted
- 6 months ago
- Reddit URL
- View post on reddit.com
- External URL
- reddit.com/gallery/1b2s1...
USC recently demolished Fluor Tower, Marks Hall, and Trojan Hall all of which were student housing. They havenāt specified what theyāll be using the space for but I would imagine it would consist of some kind of housing.