Greetings Comrade,
Time is there! Krasnaya Square will be build from now on!
The Building progress will be in different stages. Each stage is a new phase in the building progress. I estimate we will need around 1 month to full fill this project, it can however differ from current estimations.
Below will follow the planned phases. Actual work might differ a bit from the planned phases. If the planning will be changed, a new announcement will be made. When we begin with a new phase, there will be an announcement for it aswell.
But afcourse, before we can build, we need to have a drawing of the plans. I have it here for you Comrades. Take a good look at it.
Head of Excecutions
Below a list of the Comrades who are in charge on certain tasks during the Construction. Not all places have been filled in yet.
Head of the Project: BolleDeBoll
Head of Measure:
Head of Builder
Phase 1 Outlining and Preparing the land for construction
In this phase, we will prepare the land for construction. This meen adding dirt on the same Y as that has been done already around the Construction area. But before we can do so, we need to have a sharp measurement of the area we need to level up.
To do:
Measure the exact area to be leveled
Level the Area to one Y hight.
Phase 2 Early Construction
In this phase, we will concentrate on the Early Construction of Krasnaya Square. This meens laying the roads and mark the sizes of the buildings.
To-Do
Laying the roads (Not constructing the actual squares, that is phase 4)
Marking the building locations
Phase 3, Wall construction
In this phase, we will concentrate ourselfs on the construction of the walls. Once the walls are done, the towers will be constructed.
To-Do
Constructing the walls.
Constructing the towers.
Phase 4 Square and Building Construction
During this phase, we will construct the buildings and Square inside the now finished walls.
To-Do
Constructing the actual Squares.
Constructing both buildings.
Phase 5, Terraforming
During this phase, we will concentrate on the terraforming of the Island. This includes making the new canals and coast line.
To-Do
Digging the new Canals.
Remove the ''old river''.
Terraform the coastline to make it look natural again.
Terraform the surroundings around the building area to fit in the landscape again.
Phase 6, Intellengtsia Statue's, Museum (objects)
Once we start with this phase, all work on the actual Square is done. Statue's of the Intellengtsia will be build on the designed location. Militairy will ridestand in a parade ride, and the museums will be filled with museum objects.
Constructing Intellengtsia Statue's. (Lenin twice the size of the others)
Placing the museum objects.
Placing the Parade.
Phase 7, Final checks, Party, Finished!
This is the last Phase. In this phase the final checks will be done to see if all phases have been completed satisfied and no things have been forgotten. After that we will have a big party to celebrate the opening of Krasnaya Square.
To-Do
Check if everything have been finished
Preparing a big feast, inviting Comrades of the wide world.
Celebrate the opening with a big feast.