This post has been de-listed
It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.
The Type 004 CVN is the next step in Chinese carrier design. With the previous Type 003 conventional CATOBAR carriers Zhejiang and Guangxi being slated for commission within the next 2 years, JNCX and Dalian are now free to laid down the next 2 aircraft carriers in JNCX and 1 in Dalian. With the first started construction in 2017, the very first carrier CVN-20 Guangdon is set to be commissioned in 2029, followed by an additional 5 carriers, forming the core 6 carriers of the 6 Carrier Battle Groups. At the center of a group of warshpis including at least 1 Type 055 and 2 Type 052, dubbed in western media as the "Chinese Ford-class", the CVN-20 class will be the center around Chinese military strategy for the foreseen future.
Name | Specs |
---|---|
Displacement | 92,560 tons standard; 111,230 tons full load |
Length | 348m |
Beam | 85m flight deck; 48m waterline |
Draft | 13m |
Hull | Flared hull carrier design with hangar deck sponsons. 2 Starboard deck edge lift in front of island with 1 starboard aft island and 1 port aft deck edge lift serving the portside angled deck catapult. The hangar is 8m high, 41m wide and 240m in length. Saving space by placing missile launchers on sponsons. |
Propulsion | Nuclear Marine Propulsion |
- | 4x MC-HTR20 |
- | 4 Propeller Shaft |
Catapults | 4 MVDC EMALS(2 bow, 2 port angled deck) |
Speed | In excess of 32 knots, 30 knots sustained |
Range | Unlimited |
Endurance | Provisions for 90 days |
Crew | 800 ship crew; 2500 flight crew (Improved Technology in Automation reduces complement) |
Sensors and Electronics | Type 382 Sea Eagle Radar |
- | Type 364 Radar |
- | Type 366 Radar |
- | Type 760 Navigation Radar |
- | Type 349A Fire Control Radar |
- | Type 922-1 radar warning receiver |
- | MGK-335MS-E Hull Mounted Sonar |
- | Towed Array Sonar |
- | H/SQC-208 Variable Depth Sonar |
- | SITN240 SATCOM |
- | JSIDLS (Joint Service Integrated Data Link System) |
- | AKD5000S SATCOM |
Decoys & Countermeasures | HZ-101A ECM & ELINT system (Upgraded from HZ-100) |
- | 4x Type 726-4A decoy launchers (18 rockets each) |
- | Kashtan-3 missile jamming system |
Armaments | 36x HQ-10 VLS |
- | 4x 30mm 11 barrel Type 1130 |
- | 4x 12.7mm machine gun |
- | 2x FLS-2 (TD-2000B based naval missile CIWS) |
Aircraft Carried | 75-100 Fixed Wing and Helicopters |
Aviation Facilities | 345 x 85 (m) flight deck |
Ships | Commissioned |
---|---|
CVN-20 (Guangdong) | 2029 |
CVN-21 (Hebei) | 2030 |
CVN-22 (Sichuan) | 2031 |
CVN-23 (Yunnan) | 2033 |
CVN-24 (Shanxi) | 2034 |
CVN-25 (Hainan) | 2035 |
Subreddit
Post Details
- Posted
- 5 years ago
- Reddit URL
- View post on reddit.com
- External URL
- reddit.com/r/GlobalPower...