This post has been de-listed
It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.
The Silent Service have always been running low on submarine numbers. With commitments all over the globe, our current fleet of Ship Submersibles are too low to maintain a continuous patrol, escort and commitments. With this, couple with the mounting pressure at Faslane from the locals to remove nuclear submarines from the base have lead to conventional submarines being a very attractive option, being cheap and still very capable.
With that in mind, the Royal Navy have chosen a deriative of the A26 submarine design by Kockums, jointly produced with BAE Systems, specially tailored to Royal Navy standards, being capable of extremely long ranged (for SSKs) patrols, with a double hull, as well as being capable of surfacing over thin ice. The subs will be built in Malmo, and fitted out at Devonport, and will conclude the Submarine Force of the 2030s initiative, and the penultimate project in the revival of the Royal Navy, with the last to be scheduled for 2028, being a deep refit of the Type 45 fleet.
Item | Spec |
---|---|
Name | Scimitar-class (A26 variant Oceanic Extended Range) |
Type | SSK |
Displacement | 4,050 tons surfaced; 5,050 tons submerged |
Length | 89m |
Draught | 6m |
Beam | 6.4m |
Speed | 12 knots; 8 knots AIP |
Range | 14,000 nm snorkel cruise; 8,000nm AIP |
Endurance | 70 days patrol, 30 days underwater |
Propulsion | Kockums Stirling Air Independent Propulsion; Turboelectric rim-driven shrouded propulsor |
Compliment | 40 (accomodations for up to 60) |
Test Depth | 200m |
Sensors | Sonar 2121 Suite |
--- | Atlas DESO 25 echosounder; 2 × Thales CM010 optronic masts; Raytheon Successor IFF |
Armament | 4 × 21 in (533 mm) torpedo tubes with stowage for up to 16 Spearfish Mod 1. Heavy Torpedos |
--- | 4x Payload Tubes each with 6 launchers for cruise missiles or pressure-tight containers, unmanned underwater vehicles (UUVs), remotely operated vehicles (ROVs), and reconnaissance and rescue systems. |
Cost | $600 million |
Ship | Commissioned |
---|---|
HMS Scimitar | 2028 |
HMS Serpent | 2029 |
HMS Spartan | 2029 |
HMS Stalker | 2030 |
HMS Supreme | 2031 |
HMS Swiftsure | 2031 |
HMS Unbroken | 2032 |
HMS Undaunted | 2032 |
HMS Unseen | 2033 |
HMS Untamed | 2033 |
HMS Upholder | 2034 |
HMS Usurper | 2034 |
Subreddit
Post Details
- Posted
- 5 years ago
- Reddit URL
- View post on reddit.com
- External URL
- reddit.com/r/GlobalPower...