This post has been de-listed
It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.
5
[Procurement] Turkey 2023-2024 Procurement
Author Summary
Post Body
2024 Defense Budget: $20 billion USD
Procurement percentage of the budget: 35% = $7 billion USD
ARMY
Name | Type | Quantity | Price | Time | Notes |
---|---|---|---|---|---|
T-70 | Utility Helicopter | 270 (80 this fiscal year) | 300 million per year | 2011-2024 | Final deliveries are scheduled for 2024. |
TAI T625 | Utility Helicopter | 200 | 200 million per year (for a total of 1.2 billion paid in installments) | 2024-2029 | Indigenously produced in Turkey |
PMT-76 | Heavy Machine Gun | Standard Issue Army-wide replacements | 150 million per year (for a total of 570 million) | 2024-2025 | Estimated around 60% of the procurement order has already been fulfilled by this date and payments will finish for 2025 |
Yeniçeri | CBRN Vehicle | 428 | 200 million per year | 2024-2029 | Yeniceri (Janissary in English) is a indigenous built Turkish CBRN Vehicle for tactical reconissance missions |
Otokar Tulpar IFV | IFV | 1,500 | 300 million per year | 2024-2029 | Intended to complement the Altay MBT in combined arms ops, a large batch of the IFV is ordered for production both for domestic use and sale abroad |
TAI T929 ATAK-2 | Heavy Attack Helicopter | 50 | 400 million per year (of a 3.6 billion dollar procurement procram) | 2024-2036 | Intended to be the next generation attack helicopter for the Turkish Army, the program is expected to take 12 years for full payments to be processed and the new helicopters delivered. |
TAI T629 | Attack Helicopter | 55 | 300 million per year (2.4 billion contract) | ||
MKE Yavuz T-155 | Self Propelled Artillery | 700 | 200 million per year | 2024-2028 | Modernization program of all Turkish 155mm field howitzers and retrofitting into SPG form. |
MKE MOT-919 | Machine Pistol | Army wide replacement | 100 million per year | 2024-2028 | |
Altay | Main Battle Tank | 250 | 400 million per year (4.75 billion contract for the first batch) | 2024-2035 | The first mass produced batch of the Turkish designed MBT. |
Bullets, ATGM rockets, artillery shells, mounted surface to air rockets, etc. | Munitions | Sufficent | 100 million per year | 2024-2030 | Procurement of miscellaneous munitions, and support equipment |
TOTAL: 2.65 billion
NAVY
TGC Trakya | Amphibious Assault Ship | 1 | 200 million per year (1 billion dollar contract) | 2024-2029 | Sister ship of the TGC Andalolu |
---|---|---|---|---|---|
Ismet Inonu class (TF-2000) | Destroyer | 8 | 400 million per year (4 billion dollar contract) | 2024-2034 | The newly approved TF-2000 procurement plan by MILGEN. All 8 ships are scheduled to be finished by 2034. |
Istanbul Class | Frigate | 4 (2 already built) | 150 million per year | 2024-2026 | Lead ship, TGC Istanbul is already built as well as TGC Izmir |
Reis Class | Diesel Powered Submarine | 6 | 100 million per year | 2024-2025 | German Type 214 design. Finishing up the final outfitting before launching all 6 in 2025 |
FAC-55 | Assault Boat | 6 | 200 million per year (1 billion dollar contract | 2024-2029 | 150 ton light assault craft for littoral and inclement weather warfare. |
ULAQ | Unmanned surface vehicle | 50 | 250 million per year (1.2 billion dollar contract) | 2024-2030 | Recently finishing R&D on the ULAQ class, the Turkish government orders a batch of ships to be produced. |
Anti Ship rockets, Surface to Air missiles, etc. | Munitions | Enough | 100 million per year | 2024-2030 | Procurement of miscellaneous munitions, and support equipment |
TOTAL: 1.4 Billion
AIR FORCE
Baykar Bayraktar Kızılelma | UCAV | 96 | 500 million per year (2.5 billion program) | 2024-2029 | |
---|---|---|---|---|---|
Bayratkar TB3 | UCAV | 244 | 500 million per year (3 billion program) | 2024-2030 | |
F-35B | Multirole Fighter | 30 | 500 million per year (2.5 billion program) | 2024-2030 | F-35B Multirole Stealth Fighter program was approved by the United States shortly after negotiations in 2022. |
Bora-2 | Ballistic Missile | 80 | 200 million per year (1 billion dollar contract) | 2024-2029 | Aditional ballistic missiles to stock up the arsenal and the construction of new silos in Trabzon and Sivas. |
TAI Hurkus | Trainer Aircraft | 100 | 50 million per year | 2024-2025 | Building new trainer aircraft for new pilot corps. |
Missiles, Bombs and Radar | Sufficent | 100 million per year | 2024-2030 | Procurement of miscellaneous munitions, and support equipment | |
TOTAL: 1.85 billion |
R&D
Name | Type | Time | Cost | Notes |
---|---|---|---|---|
TAI F-X | Multirole All Weather Fighter | 2024-2029 | 2 billion (400 million per year allocated for further R&D) | Assistance from Algeria and Pakistan into the project shortened the dev process. |
MILGEN Aircraft Carrier Program | Aircraft Carrier | 2024-2029 | 4 billion (1 billion for R&D) 200 million per year | A project for a national aircraft carrier, design revisions after the removal of Erdogan would propose the project for a sized down flagship aircraft carrier sporting 50,000 tons |
ROKETSAN Space Launch Center | Infrastructure | 2024-2025 | 50 million per year | Finishing up construction of ROKETSAN Space center to conduct tests on Turkish spacecraft. |
UHSGP | Hypersonic Weapons Program | 2024-2030 | 200 million per year | A not insignificant portion of the R&D budget is being reallocated towards concept development, R&D to the feasibility of Turkish hypersonic weapons with collaboration from ROKETSAN, Aselsan and Baykar. |
MILDEN | Submarine | 2024-2027 | 150 million per year | National program towards the development of indigenous submarines (Already begun in 2019, finishing up concept development by 2027 for submarines to be built) |
Bayratkar TB4 | UCAV | 2024-2030 | 50 million per year | Start the development process of next gen UCAVs once TB3s enter mass production |
Munitions Upgrade Program | Munitions | 2024-2030 | 50 million per year | Investing state resources into upgrades of field equipment, munitions and other gear. |
TOTAL: 1.1 billion
GRAND TOTAL: $7 billion USD
Author
Account Strength
90%
Account Age
4 years
Verified Email
Yes
Verified Flair
No
Total Karma
2,530
Link Karma
2,289
Comment Karma
116
Profile updated: 3 hours ago
Posts updated: 8 months ago
Subreddit
Post Details
Location
Age
2
We try to extract some basic information from the post title. This is not
always successful or accurate, please use your best judgement and compare
these values to the post title and body for confirmation.
- Posted
- 2 years ago
- Reddit URL
- View post on reddit.com
- External URL
- reddit.com/r/Geosim/comm...