Coming soon - Get a detailed view of why an account is flagged as spam!
view details

This post has been de-listed

It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.

5
[Procurement] Turkey 2023-2024 Procurement
Author Summary
GalacticDiscourse090 is age 2 in Procurement
Post Body

2024 Defense Budget: $20 billion USD

Procurement percentage of the budget: 35% = $7 billion USD

ARMY

Name Type Quantity Price Time Notes
T-70 Utility Helicopter 270 (80 this fiscal year) 300 million per year 2011-2024 Final deliveries are scheduled for 2024.
TAI T625 Utility Helicopter 200 200 million per year (for a total of 1.2 billion paid in installments) 2024-2029 Indigenously produced in Turkey
PMT-76 Heavy Machine Gun Standard Issue Army-wide replacements 150 million per year (for a total of 570 million) 2024-2025 Estimated around 60% of the procurement order has already been fulfilled by this date and payments will finish for 2025
Yeniçeri CBRN Vehicle 428 200 million per year 2024-2029 Yeniceri (Janissary in English) is a indigenous built Turkish CBRN Vehicle for tactical reconissance missions
Otokar Tulpar IFV IFV 1,500 300 million per year 2024-2029 Intended to complement the Altay MBT in combined arms ops, a large batch of the IFV is ordered for production both for domestic use and sale abroad
TAI T929 ATAK-2 Heavy Attack Helicopter 50 400 million per year (of a 3.6 billion dollar procurement procram) 2024-2036 Intended to be the next generation attack helicopter for the Turkish Army, the program is expected to take 12 years for full payments to be processed and the new helicopters delivered.
TAI T629 Attack Helicopter 55 300 million per year (2.4 billion contract)
MKE Yavuz T-155 Self Propelled Artillery 700 200 million per year 2024-2028 Modernization program of all Turkish 155mm field howitzers and retrofitting into SPG form.
MKE MOT-919 Machine Pistol Army wide replacement 100 million per year 2024-2028
Altay Main Battle Tank 250 400 million per year (4.75 billion contract for the first batch) 2024-2035 The first mass produced batch of the Turkish designed MBT.
Bullets, ATGM rockets, artillery shells, mounted surface to air rockets, etc. Munitions Sufficent 100 million per year 2024-2030 Procurement of miscellaneous munitions, and support equipment

TOTAL: 2.65 billion

NAVY

TGC Trakya Amphibious Assault Ship 1 200 million per year (1 billion dollar contract) 2024-2029 Sister ship of the TGC Andalolu
Ismet Inonu class (TF-2000) Destroyer 8 400 million per year (4 billion dollar contract) 2024-2034 The newly approved TF-2000 procurement plan by MILGEN. All 8 ships are scheduled to be finished by 2034.
Istanbul Class Frigate 4 (2 already built) 150 million per year 2024-2026 Lead ship, TGC Istanbul is already built as well as TGC Izmir
Reis Class Diesel Powered Submarine 6 100 million per year 2024-2025 German Type 214 design. Finishing up the final outfitting before launching all 6 in 2025
FAC-55 Assault Boat 6 200 million per year (1 billion dollar contract 2024-2029 150 ton light assault craft for littoral and inclement weather warfare.
ULAQ Unmanned surface vehicle 50 250 million per year (1.2 billion dollar contract) 2024-2030 Recently finishing R&D on the ULAQ class, the Turkish government orders a batch of ships to be produced.
Anti Ship rockets, Surface to Air missiles, etc. Munitions Enough 100 million per year 2024-2030 Procurement of miscellaneous munitions, and support equipment

TOTAL: 1.4 Billion

AIR FORCE

Baykar Bayraktar Kızılelma UCAV 96 500 million per year (2.5 billion program) 2024-2029
Bayratkar TB3 UCAV 244 500 million per year (3 billion program) 2024-2030
F-35B Multirole Fighter 30 500 million per year (2.5 billion program) 2024-2030 F-35B Multirole Stealth Fighter program was approved by the United States shortly after negotiations in 2022.
Bora-2 Ballistic Missile 80 200 million per year (1 billion dollar contract) 2024-2029 Aditional ballistic missiles to stock up the arsenal and the construction of new silos in Trabzon and Sivas.
TAI Hurkus Trainer Aircraft 100 50 million per year 2024-2025 Building new trainer aircraft for new pilot corps.
Missiles, Bombs and Radar Sufficent 100 million per year 2024-2030 Procurement of miscellaneous munitions, and support equipment
TOTAL: 1.85 billion

R&D

Name Type Time Cost Notes
TAI F-X Multirole All Weather Fighter 2024-2029 2 billion (400 million per year allocated for further R&D) Assistance from Algeria and Pakistan into the project shortened the dev process.
MILGEN Aircraft Carrier Program Aircraft Carrier 2024-2029 4 billion (1 billion for R&D) 200 million per year A project for a national aircraft carrier, design revisions after the removal of Erdogan would propose the project for a sized down flagship aircraft carrier sporting 50,000 tons
ROKETSAN Space Launch Center Infrastructure 2024-2025 50 million per year Finishing up construction of ROKETSAN Space center to conduct tests on Turkish spacecraft.
UHSGP Hypersonic Weapons Program 2024-2030 200 million per year A not insignificant portion of the R&D budget is being reallocated towards concept development, R&D to the feasibility of Turkish hypersonic weapons with collaboration from ROKETSAN, Aselsan and Baykar.
MILDEN Submarine 2024-2027 150 million per year National program towards the development of indigenous submarines (Already begun in 2019, finishing up concept development by 2027 for submarines to be built)
Bayratkar TB4 UCAV 2024-2030 50 million per year Start the development process of next gen UCAVs once TB3s enter mass production
Munitions Upgrade Program Munitions 2024-2030 50 million per year Investing state resources into upgrades of field equipment, munitions and other gear.

TOTAL: 1.1 billion

GRAND TOTAL: $7 billion USD

Author
Account Strength
90%
Account Age
4 years
Verified Email
Yes
Verified Flair
No
Total Karma
2,530
Link Karma
2,289
Comment Karma
116
Profile updated: 3 hours ago
Posts updated: 8 months ago
President Zury Rios | Guatemala

Subreddit

Post Details

Location
Age
2
We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
2 years ago