Coming soon - Get a detailed view of why an account is flagged as spam!
view details

This post has been de-listed

It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.

64
Concrete questions
Post Flair (click to view more posts with a particular flair)
Post Body

I’m pouring a frame for my brick pavers and a sidewalk at my home, 4 1/2’Wide by 54’long. 20’ is along the house on my block foundation. I have right at 1’ fall so slop is ok. I’m using sill plate gasket as my barrier along the house and as my reference line when I screed. Im pouring on top of my footer tile drain, so I put thick weed barrier over the drain and compacted everything. What would suffice for my joint spacing ? And did I go overkill ? After concrete drys I will start my brick pavers.

Images
Author
Account Strength
40%
Account Age
1 month
Verified Email
Yes
Verified Flair
No
Total Karma
103
Link Karma
51
Comment Karma
52
Profile updated: 1 day ago
Posts updated: 1 day ago

Subreddit

Post Details

We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
1 month ago