I’m pouring a frame for my brick pavers and a sidewalk at my home, 4 1/2’Wide by 54’long. 20’ is along the house on my block foundation. I have right at 1’ fall so slop is ok. I’m using sill plate gasket as my barrier along the house and as my reference line when I screed. Im pouring on top of my footer tile drain, so I put thick weed barrier over the drain and compacted everything. What would suffice for my joint spacing ? And did I go overkill ? After concrete drys I will start my brick pavers.