Coming soon - Get a detailed view of why an account is flagged as spam!
view details

This post has been de-listed

It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.

6
Bryn News May
Post Body

We've done a lot since the past Bryn News! I'm pleased to say that a significant percentage of the grief is cleaned up, largely thanks to volunteers, and there are multiple cleared plots available for new people. While some private land is still griefed, it is mostly minor things like broken glass or small entry holes. This should be relatively easy to fix. Additionally, 2 of our large trees have been restored, including the long gone tree around which Bryn was originally built.

Factory Status:

We currently have 4 factoies: The Wood Cauldron, Charcoal Burner, Stone Smelter, and Sand Smelter. As of today all are at approximately 50% health and should not be in danger of funtionality loss until about two weeks from now The most exciting thing, however, is that ArkenX and I will be building some of the diamond equipment factories in the near future, so we will have access to high tier goods once again. Additionally, after our portal farm is fixed, we will have enough materials that we can begin to run a diamond cauldron and start chugging out XP to either use or sell.

Transportation:

As some of you may know, we are no longer directly attached to Orion by rail. The old line is still in service but it is disconnected and a transfer is now necessary. While this is unfortunate, it does present us with an opportunity. In the semi-long term, I'd like to build a tunnel directly west to intersect the new Aurora-Orion line. this will greatly improve travel time to Orion, and may once again make us a transport hub as the fastest way from the -/- to Fellowship will be through Bryn. Additionally, Remnant's rail tunnel to Bryn has been dug, and is now awaiting tracks. If all goes well, the new line should be up and running soon!

To reflect these new lines changes it may be in our best interest to remodel the rail station, though this need not be a priority at the moment.

Author
Account Strength
100%
Account Age
13 years
Verified Email
Yes
Verified Flair
No
Total Karma
46,917
Link Karma
313
Comment Karma
46,519
Profile updated: 2 days ago
Posts updated: 8 months ago

Subreddit

Post Details

We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
10 years ago