Coming soon - Get a detailed view of why an account is flagged as spam!
view details

This post has been de-listed

It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.

5
Forming and welding of pipe elbows
Post Body

First Iā€™m not a knowledgable code person. I have spent years in the pressure vessel industry but on the machining side. I have my own company and we have a customer with a specific requirement.

In the past we have formed in specifically made dies, transition cones, elbows and tees in halves out of exotic high corrosion resistant materials ( titanium hastalloy, stainless). Our customer then takes the halves and welds them together and incorporates them into their vessels. This customer is an ASME code shop.

We have the opportunity to supply a very large quantity of parts to them however they do not want to weld them. They want us to supply them welded and ready for fitting and welding into their pipe spools.

If we formed them and had a third party code shop weld them would that cover us from a code point of view? Also what ASME code would this be governed by? B31?

Thanks in advance for the comments/help

Author
Account Strength
70%
Account Age
3 years
Verified Email
Yes
Verified Flair
No
Total Karma
1,327
Link Karma
659
Comment Karma
668
Profile updated: 1 month ago
Posts updated: 1 month ago

Subreddit

Post Details

We try to extract some basic information from the post title. This is not always successful or accurate, please use your best judgement and compare these values to the post title and body for confirmation.
Posted
11 months ago