This post has been de-listed
It is no longer included in search results and normal feeds (front page, hot posts, subreddit posts, etc). It remains visible only via the author's post history.
2
Haz area wiring systems
Post Body
Hey guys, only ever done haz area maintenance, never installs. Looking at running a new cable, as per 60079.14 9.3.2.3, if the cable goes through a zone 1, but the equipment being installed as Ex d in zone 2, do I need to select cable to suit zone 1 as the trays go through zone 1 or zone 2 as that's where the equipment is installed. Cheers
Post Details
We try to extract some basic information from the post title. This is not
always successful or accurate, please use your best judgement and compare
these values to the post title and body for confirmation.
- Posted
- 11 months ago
- Reddit URL
- View post on reddit.com
- External URL
- reddit.com/r/PLC/comment...